엔지니어링활동주체
(도로,토질,구조)

Bridge construction

Improved PSC Girder (SOC Girder)

SOC(shape Optimization Prestressed Concrete) Girder Facilitates the optimal surface efficiency, economic feasibility and safety enhancement.

Hollow PSC Girder

The patented Hollow PSC Girder can restrain the tensile stress of the uppper flange concrete on the central part of beam structures.

Construction Method of Temporary Bridges

Daum Engineering has the patented technology on the efficient construction of temporary bridges for various uses. This technology also enables the easy construction of long-span temporary bridges when necessary.